Abstract
A nonpreemptive single stage manufacturing process with parallel, unrelated machines and multiple job types with setups (PUMS) is considered. We propose a hybrid approximation procedure where a Lag- rangean relaxation dual and a Lagrangean decomposition dual are solved one after the other to generate a good lower bound on the optimal makespan value. Computational results are reported.
| Original language | English |
|---|---|
| Pages (from-to) | 1247-1261 |
| Number of pages | 15 |
| Journal | Journal of the Operational Research Society |
| Volume | 47 |
| Issue number | 10 |
| DOIs | |
| Publication status | Published - Oct 1996 |
Keywords
- Lagrangean decomposition
- Lagrangean relaxation
- Scheduling
Fingerprint
Dive into the research topics of 'A hybrid bounding procedure for the workload allocation problem on parallel unrelated machines with setups'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver