Abstract
We consider a dynamic lot-sizing model with demand time windows where n demands need to be scheduled in T production periods. For the case of backlogging allowed, an O(T 3) algorithm exists under the non-speculative cost structure. For the same model with somewhat general cost structure, we propose an efficient algorithm with O(max {T2, nT}) time complexity.
| Original language | English |
|---|---|
| Pages (from-to) | 11-26 |
| Number of pages | 16 |
| Journal | Journal of Global Optimization |
| Volume | 37 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - Jan 2007 |
Bibliographical note
Funding Information:Acknowledgements The author would like to thank the anonymous referees for their comments in improving the paper. He also really appreciates a thorough review from one of the referees despite many mistakes in the first version of the paper. This study was supported in part by research funds from Chosun University, 2006.
Keywords
- Demand time window
- Dynamic lot-sizing model
- Dynamic programming
- Non-speculative cost structure
- Production
Fingerprint
Dive into the research topics of 'An efficient procedure for dynamic lot-sizing model with demand time windows'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver