Skip to main navigation Skip to search Skip to main content

Application of critical pathway of integrative medical service for lumbar herniated nucleus pulposus: A protocol for single-centered prospective observational study

Research output: Contribution to journalArticlepeer-review

1 Citation (Scopus)

Abstract

Background: Lumbar herniated nucleus pulposus (L-HNP) is a condition in which fibroblasts escape due to degenerative changes or external forces in the intervertebral disc, causing neurological symptoms by compressing the dura mater or nerve root. Objectives: The purpose of this study is to analyze and compare the effectiveness, economic feasibility, and safety of using an integrated medical service critical pathway (CP) in L-HNP patients. Methods: This single-center prospective observational study will be performed at Kyung Hee University Medicine Hospital and Kyung Hee University Korean Medicine Hospital. The inclusion criteria are a diagnosis of L-HNP on magnetic resonance imaging or computed tomography scans, age under 80 years, a visual analog scale score of 7 or higher for either lower back pain or lower extremity pain. The included 102 participants will be classified into 6 groups (n = 17 in each group): CP application with conservative treatment; CP application with open discectomy; CP application with intrabody fusion; conservative treatment without CP application; open discectomy without CP application; and interbody fusion without CP application. We will collect data on the visual analog scale, ODI, SF-36, and EQ-5D-3L scores; number of admission days; medical staff satisfaction; patients health service satisfaction; waiting time for consultations; use of pain relievers; and CP application and completion rates. Conclusion: In future, this study is expected to serve as a basis for follow-up studies on the development and application of CPs in integrated medical services for various diseases, including lumbar herniated nucleus pulposus.

Original languageEnglish
Pages (from-to)E33703
JournalMedicine (United States)
Volume102
Issue number19
DOIs
Publication statusPublished - 12 May 2023

Bibliographical note

Publisher Copyright:
© Copyright 2023 the Author(s). Published by Wolters Kluwer Health, Inc.

Keywords

  • critical pathway
  • integrative medical service
  • lumbar herniated nucleus pulposus
  • prospective observational study

Fingerprint

Dive into the research topics of 'Application of critical pathway of integrative medical service for lumbar herniated nucleus pulposus: A protocol for single-centered prospective observational study'. Together they form a unique fingerprint.

Cite this