Skip to main navigation Skip to search Skip to main content

Developing a Production Scheduling System for Modular Factory Using Constraint Programming

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

3 Citations (Scopus)

Abstract

This paper presents a production scheduling system that optimizes operations of a modular factory. The proposed system consists of a database, a scheduling optimizer and an interface connecting two other components. A scheduling model for optimal schedules plays a key role in the scheduling system. In this research, we aim to develop the scheduling model using constraint programming, and design a data mart storing the related operational data. In particular, we set the modular factory environment to the hybrid flow shop and apply the constraint programming for scheduling. We provide a case study to test the performance of the proposed scheduling model with the synthesized dataset based on a modular factory environment in SmartFactoryKL.

Original languageEnglish
Title of host publicationAdvances in Service and Industrial Robotics - Proceedings of the 28th International Conference on Robotics in Alpe-Adria-Danube Region RAAD 2019
EditorsKarsten Berns, Daniel Görges
PublisherSpringer Verlag
Pages126-133
Number of pages8
ISBN (Print)9783030196479
DOIs
Publication statusPublished - 2020
Event28th International Conference on Robotics in Alpe-Adria-Danube Region, RAAD 2019 - Kaiserslautern, Germany
Duration: 19 Jun 201921 Jun 2019

Publication series

NameAdvances in Intelligent Systems and Computing
Volume980
ISSN (Print)2194-5357
ISSN (Electronic)2194-5365

Conference

Conference28th International Conference on Robotics in Alpe-Adria-Danube Region, RAAD 2019
Country/TerritoryGermany
CityKaiserslautern
Period19/06/1921/06/19

Bibliographical note

Publisher Copyright:
© Springer Nature Switzerland AG 2020.

Keywords

  • Constraint programming
  • Flexible manufacturing
  • Hybrid flow shop
  • Production scheduling
  • Smart factory

Fingerprint

Dive into the research topics of 'Developing a Production Scheduling System for Modular Factory Using Constraint Programming'. Together they form a unique fingerprint.

Cite this