Abstract
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.
| Original language | English |
|---|---|
| Title of host publication | Ground-Based and Airborne Telescopes III |
| Edition | PART 1 |
| DOIs | |
| Publication status | Published - 2010 |
| Event | Ground-Based and Airborne Telescopes III - San Diego, CA, United States Duration: 27 Jun 2010 → 2 Jul 2010 |
Publication series
| Name | Proceedings of SPIE - The International Society for Optical Engineering |
|---|---|
| Number | PART 1 |
| Volume | 7733 |
| ISSN (Print) | 0277-786X |
Conference
| Conference | Ground-Based and Airborne Telescopes III |
|---|---|
| Country/Territory | United States |
| City | San Diego, CA |
| Period | 27/06/10 → 2/07/10 |
Keywords
- Actuators
- Mirror cooling
- Mirror support
- Solar telescope
Fingerprint
Dive into the research topics of 'GREGOR telescope- Start of commissioning'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver